A UAE hotel or residential tower has more water systems than most guests realise: swimming pools and spas, rooftop and underground storage tanks, cooling towers, domestic hot water, kitchens and often an on-site RO plant. In a hot climate, small lapses grow quickly. A routine, written checklist is the simplest way to keep every system under control and to show inspectors your records.
A practical routine
| System |
Daily |
Weekly |
Monthly or periodic |
| Swimming pools and spas |
Free chlorine, pH, temperature, log with initials |
Check chemical stocks and dosing pumps |
Total alkalinity, and microbiological samples as required |
| Drinking water tanks and taps |
Visual checks of tank covers and rooms |
Free chlorine at selected taps |
Turbidity, plus lab samples for bacteria as required |
| Cooling towers |
Conductivity and biocide dosing check |
pH and inhibitor level |
Microbiological testing by an accredited lab |
| RO plant |
Conductivity (feed and permeate), pressure |
Chlorine after dechlorination |
Hardness, silica, membrane cleaning review |
Frequencies are examples. Your required tests and limits depend on your emirate, your free zone and your operating licence. Confirm them with your authority and your water treatment contractor.
The equipment that covers most of it
-
Digital colorimeter for chlorine and pH: one instrument for the pool and tank checks, with objective readings you can log.
-
Conductivity meter: for cooling towers and RO feed and permeate.
-
Titration set: for hardness and alkalinity. See our titration guide.
-
Reagent stock: reagents expire, so rotate them and keep spares.
Where to dig deeper
FAQ
Who should do the daily tests?
Train a few named staff, such as the pool attendant and a maintenance technician, and give them a simple log sheet. Review the logs weekly.
Do we still need an outside lab?
Yes, for microbiological and regulatory samples that require an accredited laboratory. On-site testing covers daily control between those samples.
Equipping a hotel or building?
Our Dubai office can supply a complete testing set with reagents and a spare-parts plan.
Request a Quote
Comments (0)